Plant & Equipment News
  • Home
  • Sections
    • Earthmoving
    • Trucks
    • Lifting
    • Mining
    • Product Updates
    • Market Insights
    • Projects
  • Regional News
    • Middle East News
    • Africa News
    • Global News
  • Magazines
  • Videos
  • Marketplace
  • Exhibitions

July – September 2025 – P&E Magazine Issue 269

July 21, 2025

How To Check The DPF Status Of A Used Construction Machine

July 14, 2025

BICES 2025 Kicks Off With A Grand Press Conference & Exhibitor Preparatory Meeting In Beijing

July 14, 2025

Kanoo Machinery Delivers 34 Magni Telehandlers

July 4, 2025
Facebook Twitter Instagram LinkedIn
Plant & Equipment News
  • Home
  • EARTHMOVING
  • TRUCKS
  • LIFTING
  • MINING
  • PROJECTS
Plant & Equipment News
Home » Ford South Africa Switches On Solar, 35 Percent Of Silverton Plant’s Electricity Now Supplied By The Sun
Africa News

Ford South Africa Switches On Solar, 35 Percent Of Silverton Plant’s Electricity Now Supplied By The Sun

By P&E StaffMay 20, 20224 Mins Read
Facebook Twitter LinkedIn WhatsApp
Ford South Africa Switches On Solar, 35 Percent Of Silverton Plant’s Electricity Now Supplied By The Sun

Ford’s Silverton Assembly Plant in Pretoria, which produces the Ranger pickup for domestic sales and exports to over 100 global markets, has flipped the switch and is now sourcing 35 percent of its electricity completely emissions-free, directly from the sun. This pioneering project is the result of a long-term power purchase agreement with SolarAfrica, with the installation of solar photovoltaic (PV) carports for 3,610 vehicles at the Silverton plant.

SolarAfrica’s innovative, large-scale solar array uses a total of 30,226 solar panels to generate 13.5MW of emissions-free electricity for the Silverton plant. This makes it one of the largest solar carports in the world, and a truly ground-breaking renewable energy project for the domestic automotive industry. It also supports Ford Motor Company’s ambitious global targets to use 100-percent carbon-free electricity across its manufacturing operations by 2035, and achieve carbon neutrality by 2050.

“We are delighted to officially flip the switch and begin receiving 35 percent of our electricity from the solar carports with the completion of the first phase of our Project Blue Oval renewable energy programme,” says Ockert Berry, VP Operations, Ford South Africa. “This project proudly puts the Silverton Assembly Plant on the map as part of Ford’s commitment to sustainability as we migrate our energy supply from fossil fuels to environmentally-friendly, renewable resources.”

“Through the long-term power purchase agreement with SolarAfrica, this project will also significantly reduce our energy costs, thus improving the efficiency and cost competitiveness of the plant,” Berry says. “It is another big step forward in modernising our manufacturing operations as we build up to the highly anticipated launch of the must-have product that is the next-generation Ranger later this year.

“Combined with our R15.8-billion investment in the Silverton Assembly Plant and supplier tooling in the Tshwane Automotive Special Economic Zone for the next-gen Ranger, we have a truly world-class facility capable of producing vehicles of the highest quality for our customers around the world.” Berry says. “Despite increasing our production capacity to 200 000 vehicles per year, the solar project delivers on our promise of reducing our impact on the environment and contributing to a cleaner, more sustainable future.”

The facts and figures of the project are truly impressive. Although some inevitable delays were experienced as a result of the COVID-19 lockdowns and the global shortage of certain components, the installation took 599 days and 35 000 man-hours to complete and supported 121 jobs amongst sub-contractors involved in the construction and installation. Approximately 59 tons of steel and 315 tons of aluminium were used for the locally manufactured solar carports.

More than 5 000 metres of medium and low-voltage cabling was used to connect the solar PV panels to 120 three-phase 100kW inverters and eight transformers, before being fed into the Silverton plant. The system is capable of producing 13.5MW of power – which is equivalent to powering almost 224 000 light bulbs, or 12 171 average households, for an entire year.

More significantly from an environmental perspective, the solar PV array will eliminate the equivalent of 20 072 tons of CO2 generated per annum, which is a major step towards achieving Ford’s carbon-free emissions targets by 2035.

“With the solar project now complete and fully operational, we are evaluating the next steps for Project Blue Oval as we strive to ultimately have the Silverton plant completely energy self-sufficient and 100-percent carbon neutral,” Berry adds.

David McDonald, CEO of SolarAfrica, commended Ford’s foresight in integrating renewable energy into its local operations. “We applaud Ford South Africa for being industry leaders and committing to a sustainability project of this stature,” McDonald says. “Being the first of its kind in South Africa to focus on the large-scale integration of renewables in the automotive sector, we are proud to see the financial and environmental benefits this landmark project addresses. We hope that this project encourages many more original equipment manufacturers and suppliers in the automotive sector to aggressively adopt renewables and become more sustainable operations.

“Aside from the environmental and cost benefits, the Ford solar project has had a big impact on job creation in the Tshwane area, which is fully supported by the City of Tshwane as it forms part of the city’s focus to grow the automotive industry as a key driver for employment,” McDonald says. “We are glad to be contributing to the sustainability of this sector and assist Ford SA in bringing its vision of job creation to life, hopefully leading to further industry growth and indirect employment.”

Ford Solar Photovoltaic SolarAfrica South Africa

Related Posts

New Holland Appoints Inchcape As Distributor In Kenya

Africa News June 16, 2025

Bauer Executes Specialist Foundation Engineering Works For Giza Station

Africa News June 13, 2025

IVECO And Ital Car SA Participate To Le Salon Méditerranéen Du Bâtiment MEDIBAT To Present The IVECO Full Offering To The Tunisian Market

Africa News June 10, 2025

Leave A Reply Cancel Reply

You must be logged in to post a comment.

Recent Posts
  • July – September 2025 – P&E Magazine Issue 269
  • How To Check The DPF Status Of A Used Construction Machine
  • BICES 2025 Kicks Off With A Grand Press Conference & Exhibitor Preparatory Meeting In Beijing
  • Kanoo Machinery Delivers 34 Magni Telehandlers
  • +971 4 5808020
  • [email protected]
LinkedIn Twitter Facebook Instagram YouTube

PlantAndEquipment.news provides recent industry news, product launches, and new machinery trends for the construction and transportation markets. With an emphasis in covering the Middle East and Africa, daily reports include the following segments: heavy equipment, trucks, cranes, spare parts, asphalt & concrete plants, material handling equipment and more.

On PlantAndEquipment.com, you will discover a leading digital marketplace to buy and sell heavy machinery vehicles, commercial vehicles, agricultural equipment, lifting equipment, and spare parts; a new and used machinery dealer directory; an auction calendar; and an exhibition calendar.

Copyright © 2026 P&E.
  • About Us
  • Terms & Conditions
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.